DUCT ASSEMBLY,AIR CONDITIONING-H
Price to win
From deduped DIBBS award lines (unit cost × quantity). Not a bid recommendation — observed history only.
Average unit cost
$515.52
Weighted average
$565.51
Weighted by quantity
Observed range
$379–$1,129
Coverage
20 awards
Oct 1, 2014 – Mar 25, 2026
Average: $515.52 · Weighted avg: $565.51 · Range: $379.12–$1,128.75 · Based on 20 awards, Oct 1, 2014–Mar 25, 2026.
Unit cost by award date · 20 priced lines
DIBBS award history
Distinct award lines for this NSN (deduped). Line total is unit cost × quantity.
20 distinct award lines
| Date | Manufacturer | Qty × unit | Total | Contract |
|---|---|---|---|---|
| Mar 25, 2026 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 33 × $620.56 | $20,478 | SPE4A726F3787P00001 |
| Aug 20, 2025 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 46 × $1,064.39 | $48,962 | SPE4A725F8205P00003 |
| Jul 16, 2025 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 18 × $1,128.75 | $20,318 | SPE4A725F7297 |
| Oct 13, 2024 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 20 × $622.76 | $12,455 | SPE4A725F0108 |
| Jun 20, 2024 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 22 × $622.76 | $13,701 | SPE4A724F8996P00001 |
| Jul 18, 2023 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 20 × $465.55 | $9,311 | SPE4A723F027R |
| Dec 6, 2022 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 21 × $465.55 | $9,777 | SPE4A723F2213P00001 |
| Jun 8, 2022 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 30 × $463.14 | $13,894 | SPE4A722F9845P00001 |
| Dec 14, 2021 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 8 × $463.14 | $3,705 | SPE4A722F3129 |
| Aug 9, 2021 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 6 × $463.14 | $2,779 | SPE4A521F169BP00001 |
| Jan 24, 2020 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 35 × $442.06 | $15,472 | SPE4A720F2905 |
| Aug 16, 2019 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 24 × $442.06 | $10,609 | SPE4A719F9627 |
| Feb 26, 2019 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 25 × $381.77 | $9,544 | SPE4A719F5611P00001 |
| Sep 28, 2017 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 23 × $381.77 | $8,781 | SPRPA115G001YXG4A |
| Sep 23, 2016 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 21 × $381.77 | $8,017 | SPRPA115G001YZ6A0 |
Manufacturers who have won this NSN
Distinct CAGEs with a confirmed DIBBS award line for this part — each opens the manufacturer page.
Approved manufacturers
Qualified to supply per MCRL — no confirmed DIBBS award on record for this NSN. Each CAGE opens the manufacturer page.
PN 901-325-130, 901-325-130-101
PN BWT29527-1
Characteristics
FLIS item characteristics from PUB LOG identification.
| Characteristic | Value |
|---|---|
| AIRCRAFT LOCATION | CABIN RETURN |
| AIRCRAFT MISSION DESIGN SERIES | V-22 |
| END ITEM IDENTIFICATION | V-22 |
| OVERALL WIDTH | INCHES MINIMUM 5.0 |
| SPECIAL FEATURES | DUCT SHALL BE OF RIGID CONSTRUCTION |
Open buys
DIBBS · quotes by Sep 25, 2026 · UNRESTRICTED