WIRE ROPE ASSEMBLY,SINGLE LEG,AV
DIBBS awards by month · trailing 12 mo
3 total
Price to win
From deduped DIBBS award lines (unit cost × quantity). Not a bid recommendation — observed history only.
Average unit cost
$143.76
Weighted average
$132.34
Weighted by quantity
Observed range
$88.16–$196
Coverage
19 awards
Sep 26, 2017 – Mar 20, 2026
Average: $143.76 · Weighted avg: $132.34 · Range: $88.16–$195.90 · Based on 19 awards, Sep 26, 2017–Mar 20, 2026.
Unit cost by award date · 19 priced lines
DIBBS award history
Distinct award lines for this NSN (deduped). Line total is unit cost × quantity.
19 distinct award lines
| Date | Manufacturer | Qty × unit | Total | Contract |
|---|---|---|---|---|
| Mar 20, 2026 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 15 × $190.95 | $2,864 | SPE4A526F4964 |
| Feb 20, 2026 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 14 × $190.95 | $2,673 | SPE4A526F4358 |
| Dec 30, 2025 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 13 × $190.95 | $2,482 | SPE4A526F2969P00001 |
| Aug 18, 2025 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 11 × $190.95 | $2,100 | SPE4A525F093G |
| Jun 17, 2025 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 9 × $190.95 | $1,719 | SPE4A525F9977P00001 |
| Mar 5, 2024 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 120 × $88.61 | $10,633 | SPE4A524F7001 |
| Jan 30, 2024 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 120 × $88.61 | $10,633 | SPE4A524F5464 |
| Jul 17, 2023 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 15 × $88.16 | $1,322 | SPE4A523F043K |
| Jun 2, 2023 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 24 × $88.16 | $2,116 | SPE4A523F9287P00001 |
| Apr 13, 2023 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 7 × $88.16 | $617 | SPE4A523F6942P00001 |
| Feb 21, 2023 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 15 × $88.16 | $1,322 | SPE4A523F5603 |
| Dec 11, 2020 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 37 × $88.16 | $3,262 | SPE4A221F1086 |
| Nov 8, 2018 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 35 × $195.90 | $6,857 | SPE4A619F3162 |
| Oct 10, 2018 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 59 × $195.90 | $11,558 | SPE4A719F0505 |
| Jul 2, 2018 | 3B1R2BELL BOEING JOINT PROJECT OFFICEAMARILLO, TXSAM | 68 × $195.90 | $13,321 | SPE4A618F437B |
Manufacturers who have won this NSN
Distinct CAGEs with a confirmed DIBBS award line for this part — each opens the manufacturer page.
Approved manufacturers
Qualified to supply per MCRL — no confirmed DIBBS award on record for this NSN. Each CAGE opens the manufacturer page.
PN 901-020-563-115
Characteristics
FLIS item characteristics from PUB LOG identification.
| Characteristic | Value |
|---|---|
| BREAKING STRENGTH | POUNDS (LB) MINIMUM 480.0 |
| CORE CONSTRUCTION | WIRE |
| CRITICALITY CODE JUSTIFICATION | AGAV |
| DIAMETER | ROPE INCHES NOMINAL 0.063 |
| END ITEM IDENTIFICATION | RELEASE MECHANISM - FAST ROPE; HELICOPTER |
| END TYPE | BOTH ENDS TERMINAL ATTACHMENT |
| FURNISHED ITEMS AND QUANTITY | PIN 1 |
| LAY METHOD | INNER LAYER RIGHT REGULAR |
| MATERIAL | ALL ATTACHMENTS COPPER |
| MATERIAL DOCUMENT AND CLASSIFICATION | WIRE ROPE MIL SPEC SINGLE MATERIAL RESPONSE -IL-W-83420, TYE 1, CO-OSITION B |
| OVERALL LENGTH | FEET MAXIMUM 1.500 |
| PART NAME ASSIGNED BY CONTROLLING AGENCY | LANYARD ASSEMBLY |
| PREFABRICATION FORM | STRAIGHT |
Open buys
DIBBS · quotes by Sep 28, 2026 · UNRESTRICTED